Factory acceptance testing (FAT) /Site acceptance testing (SAT)
3.4 Equipment, especially if incorporating novel or complex technology, should be
evaluated at the vendor prior to delivery.
3.5 Prior to installation, equipment should be confirmed to comply with the URS/
functional specification at the vendor site unless otherwise justified.
3.6 Where appropriate and justified, documentation review and some tests could be
performed at the FAT stage without the need to repeat on site if it can be shown that
the functionality is not affected by the transport and installation.
3.7 FAT may be supplemented by the execution of a SAT following the receipt of
equipment at the manufacturing site.
FAT/SAT
3.4 设备,尤其是包含新的或复杂技术的,在制作商发货之前就要评估。
3.5 除非另有合理性说明,在安装之前,要确认设备符合URS/功能性说明。
3.6 在合适且合理时,如果可以证明运输和安装不会影响设备得功能,那么文件
审核和一些测试在SAT阶段进行了之后就没有必要再SAT阶段重复。
3.7 FAT是在生产商接收设备后对SAT执行的补充。 |
|