金币
UID176556
帖子
主题
积分25203
注册时间2014-6-6
最后登录1970-1-1
听众
性别保密
|

楼主 |
发表于 2017-3-4 23:48:21
|
显示全部楼层
Operational checks: Spark test ,Volume Calibration of reactor,check the stirring of reactorand current,Vacuum test & Test for Heating / Cooling1) Volume Calibration of reactorTitle : To check the calibration of reactorTest Objective : The objective of these tests is to ensure the volume calibration of reactor.Parameter Level Observed volume in Liters Checked by Volume calibrationStirrer touching volumeThermo well touching volumeOver flow volume in vesselJacket volumeComments:2)Test to check the stirring of reactor and current:Title : To check the stirring of the reactor and current.Test Objective : The objective of these tests is to check and ensure that the reactor stirrerrotates in specified direction at specified RPM and draws specified current. Acceptance Criteria : The acceptance criteria are specified in the following table.Parameter Acceptance criteria Actual observation Checked byTest for RPM 48 rpmDirection of Rotation ClockwiseNo load current NMT ____ AmpsCurrent with full load NMT ____ AmpsComments:3) Vacuum test:Title : To check the vacuum functions in the reactorTest Objective : The objective of these tests is to check achieving and holding of vacuum inthe reactor thus ensuring that all the joints are proper and the vacuum pump functionsnormal.Sr.No. Procedure Date StartTime EndTime Duration Observation CheckedBy1. Ensure all the openings of the reactor are closed.2. Start vacuum pump
|
|